Skip to content

Get started

Start with your cellar, then tell us who to contact.

Two stages: check the numbers for one venue or several, then prepare the details for a personalised assessment and possible introduction to DING.

  1. 01 · Your savings inputs
  2. 02 · Your contact details

Stage one · your numbers

Map your current clean

These are editable example values for one venue. Move the sliders or enter exact figures beside them to reflect your cellar and costs.

Cellar and cleaning
130

For assessment context; it is not multiplied into the saving.

130
0.110

Average amount lost when each line is cleaned.

Beer, people and supplies
£0£5
£0£15

Shown as a separate sales scenario only.

£0£50
110
08
£0£50
£0£50
Your DING quote

Leave these blank until DING gives you a written quote. Enter £0 where a cost is included.

Include powder or service charges not already in rental.

Your illustrative result

A clearer view of the cost

The estimate uses your entries and a comparison with 13 cleans in a year. DING must confirm the applicable interval and quote.

Gross potential annual benefit

£2,847

Add both quoted DING costs to calculate net and monthly benefit.

Current cleans per year
52
Proposed cleans per year
13
Current estimated cleaning cost / year
£3,796
Proposed cleaning cost / year, before DING
£949
Current beer lost to cleaning
1,040 pints
Potentially avoidable beer waste
780 pints
Avoided stock cost
£1,404
Labour saving
£1,170
Chemical and other consumables
£273
Gross potential benefit
£2,847
Annual DING costs
Awaiting quote
Proposed total cost / year, with DING
Awaiting quote
Net annual benefit
Awaiting quote

A separate sales scenario

If every avoided pint could be sold, sales revenue could be up to £4,056. This is not added to the benefit above and is not a sales forecast.

Download a PDF of these figures

The PDF is generated in this browser from your current inputs. It does not send or save your venue name.

One venue only. Lost beer is valued at your stock cost. Labour and consumables use your per-clean inputs. This excludes any installation, deposit, pre-clean, tax or other one-off costs. The 28-day cycle is illustrative and must follow DING's site-specific instructions and your supply agreement. No saving is guaranteed.

Assess more than one venue?

Add up to four more venues. Each starts with a copy of your first venue's figures; edit it to reflect that cellar. The combined result sums each venue's costs once. A missing DING quote for any venue leaves the combined net figure pending.

Your figures remain in this browser tab as you move to stage two. They are not sent or saved unless you choose to submit a live request.